![]() Provide legal notice to the public or judicial notice to the courts.īureau of Land Management, Interior. Rendition of the daily Federal Register on does not Until the ACFR grants it official status, the XML Legal research should verify their results against an official edition of The official SGML-based PDF version on, those relying on it for The material on is accurately displayed, consistent with While every effort has been made to ensure that Regulatory information on with the objective ofĮstablishing the XML-based Federal Register as an ACFR-sanctioned The OFR/GPO partnership is committed to presenting accurate and reliable Register (ACFR) issues a regulation granting it official legal status.įor complete information about, and access to, our official publications Informational resource until the Administrative Committee of the Federal This prototype edition of theĭaily Federal Register on will remain an unofficial ![]() Each document posted on the site includes a link to theĬorresponding official PDF file on. The documents posted on this site are XML renditions of published Federal Register, and does not replace the official print version or the official It is not an official legal edition of the Federal Resource extraction projects on federal land, like Casa Diablo IV, pump royalties and money “in lieu of property taxes” into local economies.This site displays a prototype of a “Web 2.0” version of the dailyįederal Register. If the project is not delayed significantly, according to Dan Lyster, Mono County’s economic development coordinator, construction could begin on the plant within “the next few years.”Īccording to Ormat, the project will bring millions of dollars-around $9.1 million-to Mono County, and more during its one-year construction period. Forest Service and the state’s Great Basin Unified Air Pollution Control District are cooperating lead agencies for the project The prospect of such a large pipeline running though one of Mammoth’s most highly used recreation areas-a pipeline that could be several feet in diameter-has alarmed local recreationists, the Town of Mammoth Lakes, and others, prompting an influx of comments in recent weeks. The approximately nine-mile-long pipeline is proposed to run from wells located to the north and east of Mammoth Lakes, including wells near Shady Rest Park. The proposed plant, called the Casa Diablo IV plant, will include as many as 16 new wells and the pipeline to bring the geothermal brine from those wells to the plant. The comments are now due to the appropriate federal offices (see sidebar) by close of business Wednesday, Jan. BLM extended the public comment period on this draft, originally due on Jan. In the meantime, the project is undergoing a federally mandated environmental review process, called a draft Environmental Impact Statement (EIS). The project is in the planning and environmental review phase and is expected to come to fruition several years from now, if it is approved by the federal land agencies on whose land it will sit. The 38-megawatt geothermal plant is proposed for a site adjacent to the existing Casa Diablo Road geothermal complex, tucked up against the volcanic bluffs to the east of the complex. Last week, the Bishop Bureau of Land Management (BLM) extended the time to comment on the project to Jan. Residents now have more time to weigh in on what could be one of the biggest infrastructure projects in Mono County’s history.Ī brand new geothermal plant that will generate as much power as all three existing Ormat Technologies power plants east of Mammoth Lake is in the works.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |